Aller au contenu
STARC – Studio d'Architecture

Home · Expertise

Our services.

Architecture, engineering, expertise — fifteen distinct missions we operate in-house, without subcontracting. One team, one point of contact, one quote.

— Why do everything in-house?

The classic separation between architect, engineering office and external auditors produces frictions that are invisible to the client but costly: exchange delays, misunderstandings, decisions lost in emails.

We have brought all technical skills together under one roof. Architecture and the Optibim engineering office work five metres apart, share BIM models in real time and settle decisions in the same room. One-off expertise (audits, energy performance, hydrology, rental permits) is handled by the same engineers who follow the ongoing projects.

For you: one quote, one point of contact, and the guarantee that nobody passes the buck when a technical question arises on site.

Architecture pole

06 missions
01

Architecture

New constructionRenovationPublic tenders

Complete design, from site diagnosis to project handover. Premium residential, tertiary, public facilities, conversions. A stable project lead from concept to keys.

02

Interior design

MaterialsCustom furnitureLighting

Integrated from the architectural sketch. Material selection, floor layout, bespoke furniture design, lighting design. Coordinated with the trades.

03

Expertise & advice

FeasibilityAcquisitionProgramming

Feasibility study before acquisition, detailed programming, audit of an existing project, comparative analysis of options. A one-off mission or a prelude to a full mission.

04

Permits & planning

CoDTRegional codesAppeals

Planning or subdivision permit application, follow-up of the administration's comments, handling of any appeals. Mastery of the Walloon and Brussels regional regulations.

05

Rental permit

WalloniaBrusselsMulti-dwelling

Complete file preparation for municipalities requiring it. Site visit, compliance with health standards, administrative support until issuance.

06

Site supervision

ManagementQuality controlHandover

Weekly site management, quality control, handling of variation orders, negotiation with contractors, provisional and final handover. Written report within 48 hours of each meeting.

Engineering pole · Optibim

09 missions
07

Structural studies

Reinforced concreteFrameworkSoil-structure

Structural calculation, sizing of load-bearing elements, approved calculation notes, reinforcement drawings. Reinforced concrete, timber framing, steel framing, mixed structures.

08

Energy performance (EPB)

nZEBCertificationPreliminary

Initial energy performance declaration, preliminary study, final certification, nZEB advice. Optimisation of the envelope and systems to meet requirements without unnecessary extra cost.

09

Housing audits

Health standardsHabitabilityWalloon Region

Complete technical diagnosis of the state of an existing dwelling. Identification of habitability defects, prioritisation of works, indicative costing. Auditors accredited by the Walloon Region.

10

Hydrological studies

StormwaterPercolation testsFlood zones

Study of the site's hydrological regime, soil percolation tests to size infiltration, sizing of stormwater management devices, analysis in flood-risk areas. Indispensable in Wallonia for permits.

11

BIM coordination

RevitIFCClash detection

IFC modelling, cross-disciplinary coordination, clash detection, automatic generation of fabrication drawings. Reduces site surprises and speeds up the tender package.

12

Safety & health coordination

Design phaseSite phaseRD 25/01/2001

Safety coordination level A and B per the Royal Decree of 25/01/2001. General coordination plan, coordination log, post-intervention file, monitoring of contractors on site.

13

3D scanner survey

Point cloudAs-built BIMRenovation

Geometric survey by laser scanner (Faro, Matterport) — millimetre precision. As-built BIM modelling of existing buildings, essential for heavy renovations and heritage.

14

Environmental permit

Single permitClasses 1-2-3Wallonia

Preparation of the environmental or single-permit file for classified installations and activities. Analysis of the applicable categories, class 3 declaration, dialogue with the administration and follow-up until issuance.

15

Special techniques

HVACElectricalBlower door & thermography

Sizing of HVAC installations (heating, ventilation, air conditioning) and electrical installations. Air-tightness testing (blower door) and energy studies by infrared thermography.

— Method

One method
whatever
the mission.

01

Flat fee

Fees set at signing, independent of the final cost of the works or the duration of the mission.

02

Single contact

One project lead who follows your file from diagnosis to handover, and coordinates the other poles internally.

03

Written reports

Every meeting yields a dated report, sent within 48 hours. The written record is our standard.

04

Shared tools

Project platform, BIM models, budget tracking — accessible to the client in read-only, continuously.

A project?

Tell us about your site, your constraints, your wishes. We will get back to you quickly with an initial diagnostic.